Quote within 24 hours Free DFM review ISO 9001 & ISO 13485 certified NDA signed before drawing review
Home/Capabilities
Capabilities

Eight processes, quoted as one part number

Most projects need more than one process. Keeping them under one roof is what removes the transfer time, the re-qualification and the argument about whose tolerance failed.

Single PO for mixed processes11 five-axis centresIn-house CMM lab
Process overview

What we run, and to what tolerance

Figures below are the tolerances we quote as standard, not the best number ever measured on one part. Tighter is possible on specific features — ask and we will tell you whether it is repeatable.

Swipe sideways for more columns →
#ProcessMax sizeStandard toleranceNotes
01 3/4/5-axis CNC milling
Complex housings, brackets, manifolds and structural parts. 11 five-axis centres for parts that would otherwise need three set-ups.
800 × 500 × 400 mm ±0.005 mm Ra 0.4 µm
02 CNC turning & mill-turn
Shafts, bushings, connectors and threaded parts, with live tooling for cross-drilling and milling in one set-up.
Ø 460 × 1,000 mm ±0.005 mm Ra 0.8 µm
03 Sheet metal fabrication
Laser cutting, CNC bending, MIG/TIG welding and hardware insertion for enclosures, frames and panels.
3,000 × 1,500 mm sheet ±0.1 mm 0.3–10 mm
04 Die casting
Aluminium and zinc die casting with in-house trimming and secondary machining, so the tolerance is held after the casting skin is removed.
Up to 8 kg shot ±0.05 mm 120–800 T
05 Powder metallurgy
Pressed and sintered parts for high-volume gears, bushings and structural components — near-net shape, minimal machining.
Up to 200 mm dia. ±0.01 mm 50k+ pcs/mo
06 3D printing
SLA, SLS and SLM for functional prototypes and low-volume end-use parts, including metal parts in 316L and AlSi10Mg.
600 × 600 × 500 mm ±0.05 mm 24 h lead
07 Vacuum casting
Silicone-mould copies in PU for 10–100 pcs bridge production, colour-matched to your spec.
Up to 1,200 mm ±0.15 mm 10–100 pcs
08 Stamping & tooling
Progressive dies for brackets, contacts and busbars, with in-house die maintenance and first-article sign-off.
Up to 400 T press ±0.02 mm 1M+ pcs
Equipment

The machine list, in full

Published so you can check whether your part fits before you send an RFQ — and so a visiting engineer can compare it with the shop floor.

Swipe sideways for more columns →
EquipmentQtyBrand / modelRange
5-axis machining centres11DMG Mori DMU 50 / Hermle C400Simultaneous 5-axis, 20,000 rpm
3-axis vertical machining centres86Haas VF-2 / VF-4, Fanuc α-D144th-axis rotary available
CNC lathes & mill-turn48Star SR-32J, Citizen L20, Doosan LynxBar feed Ø5–32 mm
Fiber laser cutters9Trumpf 3030, Bodor 30150.3–10 mm, 3,000 × 1,500
CNC press brakes14Amada HG 1003, Trumpf TruBend100–300 T
Die casting machines12120–800 T cold chamberAl / Zn
Injection & silicone moulding1860–380 TPrototype tooling in 7 days
Sintering furnaces6Continuous belt + vacuumPowder metallurgy
Secondary operations

Finishing is where most schedules slip

Anodising, plating and heat treatment are the steps that quietly add two weeks. We hold these in a fixed weekly cycle with two approved finishing houses, both within 40 km, and both audited annually against our own control plan.

That means your parts do not sit in a queue at a third party you have never met — and if a finish fails inspection, the rework happens here, not in a supplier's inbox.

How we inspect it →
Sheet metal components after finishing
Surface finishes

Ten finishes, specified the way your drawing specifies them

Swipe sideways for more columns →
FinishTypical specLead time added
Anodising, Type IIMIL-A-8625 Type II, 10–25 µm, any RAL3–5 days
Anodising, Type III hardMIL-A-8625 Type III, 25–50 µm5–7 days
Powder coating60–120 µm, RAL / Pantone matched3–5 days
Zinc platingISO 2081, clear / yellow / black3–4 days
Nickel platingElectroless, 5–15 µm4–6 days
PassivationASTM A967, stainless only1–2 days
Bead blasting120–220 grit, uniform matt1–2 days
Heat treatmentT6 / T651, or hardening to HRC spec5–8 days
Laser markingSerial, logo, UDI / DataMatrix1 day
ElectropolishingRa 0.2 µm, hygienic applications3–5 days

Finishes marked on your drawing are quoted as specified. If a standard call-out is ambiguous we come back with a question rather than an assumption — that is usually the difference between a passing and a failing first article.

Tell us the process, we will tell you the risk

Send the drawing and we come back with price, lead time and the two features most likely to cause a problem.